-
2412-2022
Merry Christmas!
Good or bad, 2022 year will gone, May the joy of Christmas be with you throughout the year!
-
3010-2022
160mm 200mm HDPE Pipes Shipped to Africa
160mm 200mm HDPE Pipes Shipped to Africa on 29th,Oct.
-
On October 20, the main project of the Huayang River flood storage area in Anhui Province started construction in Susong County, marking that the project construction has officially entered the implementation stage.
-
1710-2022
China Railway New Company was established! The registered capital will reach 38.7 billion RMB!
China Railway New Company was established! The registered capital will reach 38.7 billion RMB! Promote the water diversion project in Central Yunnan!
-
1310-2022
Shandong Province will invest 385.5 billion RMB to build an integrated modern water network
During the "14th Five-Year Plan" period, 1,088 key water conservancy projects were implemented in the construction of the modern water network in Shandong, with a total investment of 385.5 billion RMB and a planned investment of 214.3 billion RMB.
-
On October 6, the commencement ceremony of the Linhai Reservoir project was held in Mudanjiang City
-
0110-2022
China 73th National Day
OCT 1st, 2022 is 73th China National Day. There will have one week holiday from 1st to 7th OCT.
-
With a total investment of about 6.3 billion USD, the second phase of the Central Yunnan project has been fully constructed on end of August, 2022.
-
One 40" contaner 200mm HDPE Pipe be shipped to Southeast market on AUG 27th, 2022
-
The Jiayan Water Conservancy Project in Guizhou and the water supply project in the northwest of Guizhou is a comprehensive large-scale water conservancy project with urban and rural water supply and farmland irrigation as its main tasks and power generation. It is the largest water conservancy project in the history of Guizhou Province. The project dam site is located in the middle reaches of the Liuchong River, a first-level tributary of the Wujiang River, in the Qixingguan District of Bijie City and the boundary of Nayong County. The dam height of the reservoir is 154m, the dam length is 429m, the normal water storage level of the reservoir is 1323m, the total storage capacity is 1.323 billion m3, the installed capacity of the power station behind the dam is 90MW, the designed irrigation area is 900,000 mu, and the total water supply population is 2.67 million, which is an I grade (1 ) type engineering.